The Iran Project
: Head of the Atomic Energy Organization of Iran (AEOI) Mohammad Eslami has emphasized that the construction of each power plant requires seven years and that he hopes two 1000-megawatt power plants would be inaugurated by 2029 concurrent with the end of the Raisi administration.