QR codeQR code

NIDC to install 10 rigs in South Azadegan

3 Jun 2014 - 22:38


TEHRAN June 3 (Shana)--National Iranian Drilling Company (NIDC) is to install ten drilling rigs in the massive South Azadegan oil field by July, managing-director of Petroleum Engineering and Development Company said.
 Abdorreza Haji-Hosseinnejad said two wells are being spudded by NIDC in the field which is shared with Iraq.



He also said that PEDEC has picked a consultant for reconsidering detailed development projects of South Azadegan field.
Iran recently cancelled its contract with China’s oil giant CNPC for the development of South Azadegan due to the Chinese contractor’s lack of commitment.
By SHANA

 

The Iran Project is not responsible for the content of quoted articles.


Story Code: 99117

News Link :
https://www.theiranproject.com/en/news/99117/nidc-to-install-10-rigs-in-south-azadegan

The Iran Project
  https://www.theiranproject.com